Grand Prairie Composite High School

Project Background and Location:

Grand Prairie (AB): Replacement of the existing Grande Prairie Composite High School, with the capacity to hold approximately 1250 students from grades 9 to 12 and a staff population of 108, upon completion. The school is a part of the Grande Prairie School Division. Total area of new construction 16,595 m2. Designed and constructed to LEED Silver standards.

Location Grand Prairie
Contract With AMAN Builders
Year Completed 2021
Owner Grande Prairie School Division
Developer Alberta Infrastructure
Contractor Aman Builders Inc.
Architect Workun Garrick Partnership, Architecture and Interior Design Inc.

Description:

Xenali’s Participation: Supply Chain and Project Management
Project Management Xenali assigned a specialized team consisting of a dedicated project manager, project manager, and site services manager to ensure the successful execution and delivery of all project responsibilities.
Supply Chain Management Xenali managed the entire procurement process, overseeing all logistics up to on-site delivery and installation. This included vendor coordination, material tracking, and delivery schedule alignment with construction progress.
Project Staging and Delivery Logistics We implemented a Just-In-Time (JIT) delivery system to the site. Our team validated all product receipts, ensured accurate delivery to each floor level, and facilitated room-specific deployment to streamline on-site efficiency.
Safety Xenali operated under strict project management protocols to maintain a safe working environment for our team. We also ensured effective coordination with other trades on-site to prevent hazards and operational delays.
Quality Control Through our Supply Chain Engagement model, Xenali integrated a series of validation and revalidation checkpoints throughout the project. We verified design specifications, delivery timelines, packaging and staging details, material installation, and final layout accuracy.