| Project Management | Xenali assigned a dedicated team—including a Project Manager, Production Manager, and Site Services Manager—to ensure smooth execution and timely delivery. |
|---|
| Supply Chain Management | Leveraging strong relationships with North American and Asian suppliers, Xenali managed the full procurement process—from design and manufacturing to onsite delivery and installation. |
|---|
| Project Staging and Delivery Logistics | Xenali committed to a JIT delivery at the site. Our team was responsible for validating receipt of products, delivery to each of the floor levels, and deployment into each of the rooms. |
|---|
| Safety | Operating on a live construction site, Xenali adhered to strict project management guidelines to ensure the safety of our team and seamless coordination with other on-site trades. |
|---|
| Quality Control | Xenali’s Supply Chain Engagement model included multiple validation checkpoints—covering design specs, schedules, packaging, and installation. Pre- and post-stage documentation minimized rework, reduced scheduling delays, and tracked any deficiencies for quick resolution. |
|---|