Project Background and Location:

Four Winds Public School identified the need to upgrade its locker system to enhance functionality and aesthetics. After a comprehensive selection process, Xenali Inc. was chosen to lead the effort. Our proven track record in delivering durable, visually appealing lockers aligned with the school’s goal of creating a more organized, secure, and student-friendly environment.

LocationMorinville, AB, Canada
Date CompletedJuly’2023
OwnerSturgeon Public School Division
General ContractorAman Builders

Description:

Xenali’s Participation: Supply Chain and Project Management
Project ManagementXenali assigned a team that consisted of a dedicated project manager, manager, and site-services manager to successfully deliver on our commitments.
Supply Chain ManagementXenali’s responsibility included all procurement-related logistics up to onsite delivery and installation.
Project Staging and Delivery LogisticsXenali committed to a JIT delivery at the site. Our team was responsible for validating receipt of products, delivery to each of the floor levels, and deployment into each of the rooms.
SafetyXenali utilized project management protocol to ensure safe operation of our team as well as safe coordination with the other trades that operated on site.
Quality ControlUsing our Supply Chain Engagement model, Xenali incorporated various checkpoints, most of which relate to validation and revalidation. We revalidate design specifications, schedules, packaging/staging requirements, installation of materials, and validation of final installation layout. Pre-stage and post-stage documentation minimized rework, minimized impact on schedule, and tracked deficiencies.

 