Project Management |
Xenali assigned a team that consisted of a dedicated project manager, manager, and site-services manager to successfully deliver on our commitments. |
Supply Chain Management |
Xenali’s responsibility included all procurement-related logistics up to onsite delivery and installation. |
Project Staging and Delivery Logistics |
Xenali committed to a JIT delivery at the site. Our team was responsible for validating receipt of products, delivery to each of the floor levels, and deployment into each of the rooms. |
Safety |
Xenali utilized project management protocol to ensure safe operation of our team as well as safe coordination with the other trades that operated on site. |
Quality Control |
Using our Supply Chain Engagement model, Xenali incorporated various checkpoints, most of which relate to validation and revalidation. We revalidate design specifications, schedules, packaging/staging requirements, installation of materials, and validation of final installation layout. Pre-stage and post-stage documentation minimized rework, minimized impact on schedule, and tracked deficiencies. |