Grand Prairie Composite High School

Project Background and Location:

Grand Prairie (AB): Replacement of the existing Grande Prairie Composite High School, with the capacity to hold approximately 1250 students from grades 9 to 12 and a staff population of 108, upon completion. The school is a part of the Grande Prairie School Division. Total area of new construction 16,595 m2. Designed and constructed to LEED Silver standards.

LocationGrand Prairie
Contract WithAMAN Builders
Year Completed2021
OwnerGrande Prairie School Division
DeveloperAlberta Infrastructure
ContractorAman Builders Inc.
ArchitectWorkun Garrick Partnership, Architecture and Interior Design Inc.

Description:

Xenali’s Participation: Supply Chain and Project Management
Project ManagementXenali assigned a specialized team consisting of a dedicated project manager, project manager, and site services manager to ensure the successful execution and delivery of all project responsibilities.
Supply Chain ManagementXenali managed the entire procurement process, overseeing all logistics up to on-site delivery and installation. This included vendor coordination, material tracking, and delivery schedule alignment with construction progress.
Project Staging and Delivery LogisticsWe implemented a Just-In-Time (JIT) delivery system to the site. Our team validated all product receipts, ensured accurate delivery to each floor level, and facilitated room-specific deployment to streamline on-site efficiency.
SafetyXenali operated under strict project management protocols to maintain a safe working environment for our team. We also ensured effective coordination with other trades on-site to prevent hazards and operational delays.
Quality ControlThrough our Supply Chain Engagement model, Xenali integrated a series of validation and revalidation checkpoints throughout the project. We verified design specifications, delivery timelines, packaging and staging details, material installation, and final layout accuracy.

Project Gallery

More Projects

Search